Bennery & Fish Lake Brooks Restoration
Bennery: complete final installation of structure sequence One digger log with deflectors. Structure to be 8.1m + 2 deflectorsplus pool deepening, maintenance on the structures installed from 2013 as well as bank stabilization are proposed for 2017. Laurie Park Brook: debris removal and pond development. The brook has a 23m rise from the lake without pools due to redirection by the CNR/NSTIR/NSDNR during the development of Laurie Park. Fish Lake to Grand Lake:Assess restoration and improvements that might avoid fish kills (gasperaux) in the future